Concrete Tilt-up 32,300 sq ft Manufacturing and Office Building

MTScan00015.jpg

Steel Framed, Deep Foundation 3 Story SFR

Conceptual Rendering A.jpg

The objectives of this build included intense prefabrication of the structural frame and use of aeriated concrete wall panels.  The structural frame was erected and clad in 6 only weeks.